Gulf Views, walk to the beach. Private home 4 bedrooms, 4 baths, pool rights | House in Santa Rosa Beach
4 Bedroom House in Dune Allen Beach, Santa Rosa Beach
Easy access to the beautiful turquoise waters and sugar white sandy beaches of 30A. Large 4 bedroom, 4 bath home with large Tower Room and 5 covered decks, 3rd floor has Big Views of the Gulf of Mexico, just an absolutely amazing location, convenient to everything!
Dune Allen Beach has 5 public beach access points all within walking distance.
Nestled beside Santa Rosa Beach Country Club/golf course, Oyster Lake, and the Gulf of Mexico this Charming Florida style beach house has 4 bedrooms and 4 bathrooms with three living areas. Fully equipped kitchen.
1 king size master bedroom on second floor with 4 piece en suite bathroom w/large jetted bathtub, and walk in shower.
3 queen size bedrooms, two are on the second floor and one in the tower suite.
2nd floor queen bedrooms share their own hall bathroom.
1 queen bedroom on third floor w/private en suite bathroom with nice private sitting area and big views of the Gulf of Mexico.
Home has easy walkable beach access and great area restaurants. Walk to Shunk Gulley to grab a bite or dip your toes in the gulf. We recommend watching the sunset from the third floor deck or sitting room; it's absolutely stunning. Lots of parking, big yard, and out door shower, community pool, bike path to the beach, beach chairs, umbrellas, cooler, beach towels, beach cart/wagon.
Gulf Views, walk to the beach Private home 4 bedrooms, 4 baths, pool rights is located in Dune Allen Beach. Gulf Views, walk to the beach Private home 4 bedrooms, 4 baths, pool rights provides accommodation, featuring Internet, Laundry, Parking, among other amenities. This House features Internet, Laundry, Parking, to make your stay a comfortable one.
Gulf Views, walk to the beach Private home 4 bedrooms, 4 baths, pool rights has 4 Bedrooms , 4 Bathrooms, and max occupancy of 8 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Dune Allen Beach has interesting places to visit. If you want to learn more about the House in Dune Allen Beach, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Air conditioning
-
Heating
-
Bathtub or shower
-
Soap
-
Toilet paper
-
Jetted bathtub
-
Shampoo
-
Hair dryer
-
Towels provided
-
4 bathrooms
-
4 bedrooms
-
Bed sheets provided
-
Dining table
-
Living room
-
Dining room
-
Toaster
-
Kitchen island
-
Blender
-
Stovetop
-
Oven
-
Microwave
-
Refrigerator
-
Paper towels
-
Dishwasher
-
Washing machine and dryer
-
Laundry facilities
-
Near laundromat
-
Beach sun loungers
-
Near the beach
-
Beach towels
-
Onsite parking
-
Wheelchair-accessible parking available
-
Car recommended
-
No pets allowed
-
5 on-site accessible parking spaces
-
No elevators
-
Smoke-free property
-
If you have requests for specific accessibility needs, please contact the property using the information on the reservation confirmation received after booking.
-
Note from host: This is a No smoking home, please be kind.
-
Wheelchair-accessible parking
-
Upper floors accessible by stairs only
-
Hiking nearby
-
Water park nearby
-
Golf privileges
-
Scuba diving nearby
-
Birdwatching nearby
-
Fitness facilities nearby
-
Cycling nearby
-
Jet skiing nearby
-
Power boating nearby
-
Golf nearby
-
Horse riding nearby
-
Smart TV with cable/satellite service
-
Games
-
Unit size: 2680 sq ft (249 sq m)
-
English
-
Near a hospital
-
Near a health or beauty spa
-
Near the bay
-
Near outlet shopping
-
Playground
-
Children's dinnerware
-
Children's books
-
Local meal delivery service
-
Iron/ironing board
-
Free WiFi
-
Outdoor furniture
-
Balcony
-
Fenced yard
-
Garden
-
Barbecue grill
-
Smoke detector installed (host has indicated there is a smoke detector on the property)
-
First aid kit
-
Carbon monoxide detector installed (host has indicated there is a carbon monoxide detector on the property)
-
Fire extinguisher
-
Deadbolt lock
-
Ski privileges
-
Shared/communal pool
-
Fence around the pool
-
Outdoor pool
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a carbon monoxide detector on the property host has indicated there is a smoke detector on the property onsite parties or group events are strictly prohibited safety features at this property include a fire extinguisher, a first aid kit, and a deadbolt lock special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation
Reviews
FAQ's
Is this Dune Allen Beach house pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
Does the Dune Allen Beach house have a swimming pool?
Yes, this Dune Allen Beach house has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in Dune Allen Beach house?
Best-rates for the Dune Allen Beach house starts from $560 per night with includes Parking, TV, Ocean View, Balcony/Terrace, Wellness Facilities, Air Conditioner, View, Security/Safety, Bedding/Linens, Fireplace/Heating, Barbecue/Outdoor Cooking, Kitchen, Pool, Entertainment, Hot Tub, Oceanfront, Sports/Activities, Child Friendly, Internet, Laundry with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is Dune Allen Beach house a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this house Good or guests have recommended them suitable for families. As reported by the owner or manager, the house has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the Dune Allen Beach house wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Dune Allen Beach house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the Dune Allen Beach house?
Based on the information reported by the owner or manager, the Dune Allen Beach house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for Dune Allen Beach house?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.